    I just recently learned what “scrum manager” is and it sounds like a cult of useless middle managers.

    • DagonPie@kbin.social
      cake
      link
      fedilink
      arrow-up
      3
      ·
      11 months ago

      I started at a new company and have been filling a scrum master role until they find me a replacement and I can move to the position I was supposed to be hired for and honestly, its the worst job I’ve ever had. Its literally hand holding and baby sitting. Its terrible. I almost got pushed in front of traffic when I asked “why cant the engineers move their own boards…?”

      • funkless_eck@sh.itjust.works
        link
        fedilink
        arrow-up
        1
        ·
        11 months ago

        checking in from the 45 minute “stand up” in which 10 people have their cameras on but only 3 people speak. So we all know we’re just working with the window as close to the camera as possible so it looks like we’re listening

      • VanillaGorilla@kbin.social
        link
        fedilink
        arrow-up
        1
        ·
        11 months ago

        Your company and mine seem to be very different. We have agile coaches, but they mostly organise cooperation and shoulder check our stakeholders if they try to scope creep some bullshit in.

        • DagonPie@kbin.social
          cake
          link
          fedilink
          arrow-up
          3
          ·
          11 months ago

          We also have agile coaches but the way my team uses jira is not at all how its supposed to be used. They are basically forcing it on us and people arent thrilled so the agile coaches are trying to mold it to what they want but they dont want it. Its a whole thing. Im also not a scrum master, Im an engineer pretending to be a scrum master as well as doing my other work and our agile coaches are…clueless for lack of a better word. Jira works great for our other teams. Just not the team Im on.

            • DagonPie@kbin.social
              cake
              link
              fedilink
              arrow-up
              1
              ·
              11 months ago

              Hey thanks I appreciate it. Like I said, just waiting for them to find a real scrum master for my team then I get to do my actual job but at least its pushing me into more of a “people skill” position. Trying to silver lining it haha

        • Scrubbles@poptalk.scrubbles.tech
          link
          fedilink
          English
          arrow-up
          2
          ·
          edit-2
          11 months ago

          Definitely not, Scrummasters should not be connected to the project at all. Their job goes directly against it, a PM is a stakeholder who will ask for everything to be done immediately, and needs to get stuff done. A Scrummaster should be neutral, and should uphold the process and defend the dev team.

          Common scenario:

          • PM: “I need this task done immediately”
          • Scrummaster: “This task does not have any definition, and the team is already working on things. Once you have requirements we can discuss options on prioritization for next sprint”

          That right there highlights where a scrummaster should be working. Most companies do treat them as neutered dogs though, and don’t give them the power. True scrummasters have the ability to push back on PMs and defend their teams, keeping developers out of it so they can stay heads down. (Less useless meetings)

          • snooggums@kbin.social
            link
            fedilink
            arrow-up
            1
            ·
            11 months ago

            A project manager should never be a stakeholder. A project manager should be managing expectations and pushing back against scope creep and ridiculous demands for immediate results as part of managing the project based on available resources and the estimates of the project team compared to overall progress. They will also address situations where different interacting parts need to be timed correctly, but that would also be the same responsibility of a scrum master, because they manage the project when using agile terms.

            Most places treat project managers as neutered middle men who are implementing the will of the stakeholders, which is why so many end up being the terrible type that you are stereotyping project managers to be. Those same organizations will do the same thing to the scrum master or whatever name they give to the person who is supposed to be managing the project. You know, a project manager.

      • vlad@lemmy.sdf.org
        link
        fedilink
        arrow-up
        0
        ·
        edit-2
        11 months ago

        Honestly, I just heard of the turn “scrum” the other day on an application, and after some looking into what that is, I came to the conclusion that it’s the corporate version of a Liberal Arts degree. Not completely useless, but almost.

        I’m sont have any influence on that applicant, btw, so I’m not influencing someone’s life based on my half assed googling.

    • 👍Maximum Derek👍@discuss.tchncs.de
      link
      fedilink
      English
      arrow-up
      0
      ·
      11 months ago

      Having worked in a lot of scrum teams in positions ranging from Jr Dev to CTO, I have become a huge proponent of scrum masters.

      1. The scrum setup is that way for a reason. The Stake Holders speak for the company, the devs speak for the infrastructure, the Scrum Master speaks for the process, and the PO is also there. And none do each others speaking jobs well. The process of scrum will tend to drift back toward dev burnout without a good SM.
      2. Devs shouldn’t be spending their time managing tickets, we should be developing. Backlog grooming, sprint ready ticket reviews, fighting with POs, stake holders, and Support, and fretting about velocity should be left to the scrum master.
      3. I will never again act as scrum master if I can help it.

      And in my experience a SM becomes a full time position at about 15 devs.

      • vlad@lemmy.sdf.org
        link
        fedilink
        arrow-up
        0
        ·
        11 months ago

        From all of the replies it was to me that a Scrum Master can be very useful in specific projects that involve interplay between many departments. But in reality it seems like it’s a way for companies to avoid creating clear job requirements.