balderdash@lemmy.zip to Lemmy Shitpost@lemmy.world · 10 months agoAmericans are asleep, post European windowslemmy.zipimagemessage-square347fedilinkarrow-up11.34K
arrow-up11.34KimageAmericans are asleep, post European windowslemmy.zipbalderdash@lemmy.zip to Lemmy Shitpost@lemmy.world · 10 months agomessage-square347fedilink
minus-squareGreatAlbatross@feddit.uklinkfedilinkEnglisharrow-up4·10 months agoI’ve just been looking into this in the UK (so Europe, but not EU). You can now get split units that come pre-filled with a safer refrigerants that a DIYer is allowed to do themselves. I would still get an electrician to do the electrical side though. 1KW constant load should definitely be on its own circuit.
I’ve just been looking into this in the UK (so Europe, but not EU).
You can now get split units that come pre-filled with a safer refrigerants that a DIYer is allowed to do themselves.
I would still get an electrician to do the electrical side though. 1KW constant load should definitely be on its own circuit.